Larry N, our project manager, reported today that he had obtained a storage unit to store our materials from CCC such as tables, chairs, books, signs, etc. Things that did not get wet are trying to be salvaged. Anything in the building that needs to be saved should be out by Friday. On Friday, a crew is coming in to strip everything off the walls. Anything left in the building will be thrown away.
The building engineer inspected our building and determined that there is no structural damage. This argument should go a long way in determining how we rebuild and what's required to obtain permits, etc.
Coffee was served this morning, and since we were outside, there was no need to start wearing boots due to the depth of the BS, but we are hopefully off to a good start there.
More later.
Tuesday, September 23, 2008